---
title: "Set Maximum Hours for Sites"
url: "https://help.celayix.com/en/article/set-maximum-hours-for-sites"
language: "en"
last_updated: "2026-05-29T18:02:49.088Z"
---

# Set Maximum Hours for Sites

Learn how to configure Maximum Hours for Sites in Schedule Xpress to help manage scheduling limits and workforce requirements.

The **Maximum Hours** feature allows organizations to define the maximum number of scheduled hours permitted for a Site within a specific time period. These limits help organizations control staffing levels and prevent Sites from being scheduled beyond operational requirements.

* * *

## Find Maximum Hours

**Maximum Hours** can be configured within the Site profile under:

**Manage Sites → Select Site → Max Hours**

![](https://cdn-assets.productfruits.com/ff277193-f227-40fe-b1c1-6da8ce8d4642)

  

  

  

* * *

## Use Maximum Hours

The **Max Hours** section allows Users to configure scheduling limits for Sites based on operational requirements.

**Maximum Hours** can be configured for:

-   Daily hours
-   Weekly hours
-   Monthly hours

These limits are used by the scheduling system to monitor total scheduled hours at a Site during schedule creation.

![](https://cdn-assets.productfruits.com/bf2a9a5a-9be4-4998-a2ad-2b6efecceb37)

  

  

  

  

  

* * *

## Configure Maximum Hours

To configure **Maximum Hours** for a Site:

1.  Open the Site profile
2.  Navigate to the **Max Hours** section
3.  Choose **Daily**, **Weekly**, or **Monthly** Maximum Hours
4.  Enter the required hour limits
5.  Add the **Effective Date**
6.  Click **Save**

Once configured, the limits will apply during scheduling workflows.

![](https://cdn-assets.productfruits.com/d6fc5284-d9c0-4fca-9054-2fc3e0bff089)

  

  

  

  

  

* * *

## Validations for Maximum Hours

When a Site is scheduled beyond its configured **Maximum Hours**, Schedule Xpress will generate a validation as either a warning or an error, depending on system configuration.

These validations help organizations control scheduled Site hours, manage staffing allocations, and maintain operational scheduling rules.

![](https://cdn-assets.productfruits.com/52e04a84-9325-4317-ace5-f2419f0eebd5)

  

  

  

  

* * *

## Why Use Maximum Hours

Organizations use **Maximum Hours** to:

-   Control Site staffing levels
-   Reduce over-scheduling
-   Support operational planning
-   Monitor scheduled Site hours
-   Maintain workforce scheduling rules

Using **Maximum Hours** helps organizations create more accurate and controlled schedules within Schedule Xpress.
